Pre-fieldwork potential of the watching brief
Keywords:
Wall, Settlement, Watching BriefAbstract
Prior to the watching brief taking place, areas of sensitivity were identified, largely based around the medieval core of the town. The potential was high, along with the possibility of resolving issues such as the existence of town walls, the location of the town market, and the primacy of either the High Street or Quality Street.Downloads
Download data is not yet available.
Downloads
Published
01-01-2009
Issue
Section
Sections
How to Cite
“Pre-Fieldwork Potential of the Watching Brief”. 2009. Scottish Historical and Archaeological Internet Reports 37 (January): 12-13. https://journals.socantscot.org/index.php/shair/article/view/2210.
