Pre-fieldwork potential of the watching brief

Authors

  • Kirsty Dingwall Author

Keywords:

Wall, Settlement, Watching Brief

Abstract

Prior to the watching brief taking place, areas of sensitivity were identified, largely based around the medieval core of the town. The potential was high, along with the possibility of resolving issues such as the existence of town walls, the location of the town market, and the primacy of either the High Street or Quality Street.

Downloads

Download data is not yet available.

Downloads

Published

01-01-2009

How to Cite

“Pre-Fieldwork Potential of the Watching Brief”. 2009. Scottish Archaeological Internet Reports 37 (January): 12-13. https://journals.socantscot.org/index.php/sair/article/view/2210.